Abstract

FACTS devices are used for controlling the voltage, stability, power flow and security of transmission lines. Imperialist Competitive is a recently developed optimization technique, used widely in power systems. This paper presents an approach to finding the optimal location and size of FACTS devices in a distribution network using the Imperialist Competitive technique. IEEE 30-bus system is used as a case study. The results show the advantages of the Imperialist Competitive technique over the conventional approaches.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.