Abstract
This work presents a novel strategy to solve a short-term planning problem for electrical distribution systems (EDSs) by taking advantage of the implementation of a simplification technique. This simplification technique removes nodes and circuits from the original EDS to reduce the number of variables to be considered in the planning stage. The planning problem is formulated as a mixed-integer linear programming problem and its solution determines the optimal allocation of capacitor banks (CBs) and wind-based distributed generation (DG) units. To validate the proposed strategy, three different test cases are analyzed using a 134-node system and its respective simplified 23-node EDS. Numerical results show that similar investment plans for the both systems can be obtained.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.