Abstract

The location of DGs and RCSs have considerable impacts on network reliability and energy loss. This paper presents a GA based method to find the optimal size and location of DGs and optimal location of RCSs simultaneously to improve distribution network reliability and reduce energy loss. A multilevel load duration curve is considered for load points to achieve a better solution. Numerical results on IEEE 33 bus distribution network show satisfactory results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.