Abstract

ABSTRACT—This article introduces a problem solution of optimal allocation and hourly scheduling of capacitor banks (C-Bs) using the sine cosine optimization algorithm (SCA) to maximize the cost saving and enhance the system reliability. The impact of reliability enhancement reveals in the objective function as a reduction of energy not supplied cost. The optimal location and size of C-Bs are determined based on two strategies; strategy 1, loss sensitivity factor is used to select the candidate buses after that optimal size of C-Bs is determined by SCA while in strategy 2, the optimal location and size of C-Bs are determined by SCA. The proposed algorithm is tested on IEEE 33 and 69-bus radial distribution systems with different scenarios of single and multi-C-Bs installation. Also the daily load variations have been considered to optimally schedule switched C-Bs steps. The simulation results using Matlab programing environment have been verified using the non-parametric Wilcoxon signed rank statistical test. The superiority of proposed algorithm is also ensured by comparing its results with other optimization methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.