Abstract

As short run manufacturing becomes more prevalent, run-to-run components of variation, such as that contributed by set-up error, have greater potential to crucially affect product quality. While efforts should be made to eliminate such between-run variance contributing factors, some will always be present. Here, we assume there is one such factor which we envisage as set-up error that, unless the process is adjusted, remains fixed throughout a run. We develop a single adjustment strategy based on taking a sample of fixed size from the process. If a significant set-up error is indicated, a single compensatory adjustment, equal to the predicted process offset, is executed. The actual procedure depends on process parameters, including adjustment error, run size, and adjustment and sampling costs. The procedure not only specifies the adjustment amount, if any, but the time during the run at which to adjust. The procedure is optimal among all fixed sample size procedures for the chosen cost function. Besides incorporating adjustment and sampling costs, the cost function is based on a 0–1 loss criterion, where the loss is 0 (1) units per item produced if the process offset caused by set-up error is less than or equal to (greater than) a specified amount. Tables are provided, with examples, illustrating the procedure for representative values of process parameters, costs, and run sizes.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.