Abstract

In designing the PEP optical diagnostics we have been able to build on the experience gained with SPEAR. Most of the problems at SPEAR could be traced to the optical diagnostic system being inside the tunnel. A machine shutdown is required for any maintenance or modification. This implies that in order to make such an instrument successful, a large engineering effort must be mounted to ensure 100% operation at startup. The functions that do not work at startup may never be made to work; this has happened at several machines. Experimental setups are likewise risky and time consuming. A point which has been borne out in both SPEAR and PEP is that the mechanical part of the instrument, the special vacuum chamber, the optical mounts, the alignment and adjustments, require approximately 60% of the effort and cost of the optical diagnostics. It is far better to economize on detectors and electronics than on mechanical and optical essentials.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.