Abstract
This paper describes the staffing and scheduling of IT help desk operators for a large petrochemical company. The objective is to reduce the labour cost by determining the best staffing level and employee weekly tour schedules required to meet the workload that varies over a 24-hr operating period. Several steps are taken for the staffing and tour scheduling of an IT help desk agents. First, data on the number of calls is used to estimate hourly labour requirements. Next, new scheduling options are proposed to better match these requirements. An Integer Programming (IP) model is then formulated and solved to determine tour scheduling assignments. Finally, alternative schedules are evaluated in terms of tradeoffs between workforce size and cost, service level and employee utilisation. The chosen tour schedules provide better service with a lower cost and a smaller number of employees.[Received 10 November 2006; Revised 23 April 2007; Accepted 18 June 2007]
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.