Abstract

The advanced main control room (advanced-MCR) is the one that allows for reactor operations based on digital instrumentation and control (I&C) technology. Thus, the operators of an advanced-MCR operate the plant through digital I&C interfaces, and for this purpose, an additional digital manipulation task for the operating equipment should be performed that cannot be observed in a conventional-MCR. As a prior study proposing the cognitive, communicative, and operational activity measurement approach (COCOA), COCOA enables an evaluation of the operator's workload in an advanced-MCR, which includes newly generated tasks for Man-Machine Interface System based secondary operation under a digital environment, which does not exist in a conventional-MCR. As a result of observations on the workload level by utilizing COCOA for a reference plant with an advanced-MCR when conducting an emergency operating procedure, it was observed that the workload of the shift supervisor is about two times greater than that of other operators. This is because operators therein stuck to the old guidelines customized to a conventional-MCR and failed to accomplish load balancing in consideration of the operation environment that an advanced-MCR provides. In this context, it would be imperative to develop and apply an operations strategy for an advanced-MCR operation. This study proposes an operations strategy in an attempt to make a balanced workload of operators in an advanced-MCR.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call