Abstract

During the past five years several OR-projects (M.Sc. Thesis) were carried out at IMSOR. These OR-projects dealt with the development of decision support systems based upon heuristic principles, for various planning, production and control problems in the Danish steel industry. The purpose of this paper is to report the methodological experiences of these projects. This paper illustrates the optimization of an existing production system using heuristics. Furthermore, the overall concept of optimizing production systems without changing the physical elements of the production system is discussed. This paper also deals with OR-projects concerning: the inventory system, jobs sequencing and production flow management. Furthermore, the paper briefly reports on two ongoing projects: a rather complicated cutting-stock problem, and a booking system for plate's orders.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.