Abstract

Automatic load following by fossil-fired generating units requires the control of the flow of air and fuel to the boiler, and of the steam flow to the turbine. Prototype load controllers designed to achieve this have been installed at coal and oil-fired power stations within the CEGB. The principle behind their design is that boiler-stored energy is made available only for system frequency regulation. This policy helps to maximise the regulation capability available to the grid system while minimising the cyclic damage inflicted on the plant. Test results and operating experience show that both coal and oil-fired units equipped with such load controllers respond successfully to both loading and frequency regulation demands. Evidence of improved coal-fired combustion efficiency has also been obtained.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.