Summary During Summer 1985, an extended high-pressure gas-condensate well test was conducted from a semisubmersible drilling unit in Block 29/5a. This paper is a case history discussing the planning and implementation of the production-test operation. The Well 29/5a-3 production test is believed to have been the most extensive high-pressure test conducted in the U.K. North Sea from a floating drilling unit. In the past, because of equipment and/or environmental constraints, high-pressure testing has been limited to short flow and buildup periods. Also, the majority of "expected" high-pressure tests conducted with 15,000-psi [103-MPa] equipment either have rapidly depleted (high-pressure, low-volume zone) or have been terminated prematurely because of mechanical problems. In contrast, the Well 29/5a-3 production test experienced no major equipment failures. In addition, surface pressure readout gauges were successfully installed under extreme pressure and temperature conditions. Proper operational planning and equipment selection proved vital in implementing the production test and achieving the main objectives.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.