Abstract
We calculated high-power forwarder productivity in regeneration felling with the objective to set long-term work plans. Based on the time studies of the forwarder operator&rsquo;s work operation the operation time consumption was calculated and operation standards for the studied type of forwarder were designed. The standard values were determined based on the volume weight of harvested timber and the forwarding distance. The resulting time consumption required for forwarding 1 m<sup>3</sup> of timber, whose mean tree volume is <br /> 0.30&ndash;0.99 m<sup>3</sup>&middot;stem<sup>&ndash;1</sup>, and upon forwarding distance of 100&ndash;1,000 m ranges from 0.05&ndash;0.09 Nh&middot;m<sup>&ndash;3</sup>. &nbsp; &nbsp;
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.