Abstract

Unit 1 at Hitachinaka Power Station, which is the newest 1,000MW coal fired power station of Tokyo Electric Power Co., Inc., entered into the commercial operation in December 2003. IHI (Ishikawajima-Harima Heavy Industries Co., Ltd.) constructed the flue gas treatment system with the state-of-the-art technology and low emission values. To meet demands for both reducing construction cost and high performance, IHI applied a single rectangular Absorber based on the simultaneous desulfurization and oxidation method, Nonleakage type Gas-Gas Heater (GGH) and Electrostatic Precipitator (ESP) at low-low temperature position. Unit 1 at Mizue Power Station of GENEX Co., Ltd., which is one of the independent power produces, entered into the commercial operation in June 2003. In this plant, IHI applied a high performance spray tower Absorber and wet type Electrostatic Precipitator (ESP) to meet the high desulfurization efficiency for vacuum residue oil firing and extremely rigorous regulation owing to location near the metropolitan area.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.