Abstract

This paper deals with the optimal operational strategy of a reverse osmosis (RO) plant for remote sites. The electricity supply to these plants comes usually from renewable energies (wind and solar), when they are not temporarily available, they are complemented by a diesel generator and batteries. The water demand of small settlements in arid regions suffers strong variations along a day. As the higher demand of water usually occurs when solar energy is more available, the operational expenses can be reduced by considering the RO plant as an active load. A good control strategy, will implement a variable operation point, taking into account the predictions of water demand, the expected variation of the available energy sources and the scheduling of cleaning operations in the RO plant, in order to optimize the energy use. In this paper a hybrid predictive control is proposed to implement this task. Simulations of a specific plant show that an adequate operation reduces the diesel energy consumption, while satisfying the variable water demand.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.