Abstract

This paper describes the application of deterministic optimization to the main stem Missouri River reservoir system and the development and testing of inferred optimal operating rules from these model results. An implicit stochastic optimization approach is taken and tested using a simplified simulation model. This work illustrates the applicability and limitations of applying deterministic optimization to development of strategic operating rules for large-scale water resource systems. For this multipurpose multireservoir system, simple data display and simulation modeling are found to be superior to classical regression techniques for inferring and refining promising operating rules from deterministic optimization results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.