Abstract

The operating room management problems are legion. This paper tackles the scheduling of surgical procedures in an operating theatre containing up to two operating rooms and two surgeons. We first solve a deterministic version that uses the constraint programming paradigm and then a stochastic version which embeds the former in a sample average approximation scheme. The latter produces more robust schedules that cope better with the surgeries' time variability

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.