Abstract

ABSTRACTThis paper describes a simulation study of the relative impact of different operating policies on performance of a hypothetical multistage production system that produces assembled products. The main objective of this study is to examine the impact of operating policy rules on system performance. Several performance criteria, including flow time and earliness and tardiness measures, were used to evaluate system performance. Results show that performance of the production system is significantly influenced by the operating policy rules, although the relative impact of the rules is dependent on the performance measure considered. Interactions between and among policy rules were also found to be important in several cases. Overall, the results indicate that much previous research in non‐assembly systems can be generalized to assembly systems.Subject Areas: Scheduling, Material Requirements Planning, and Simulation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.