Abstract

JSW Steel Ltd is an integrated steel plant of 3·8 mtpa capacity, with two Corex and two blast furnace (BF) units for producing hot metal. It has started its integrated steel plant operation with Corex ironmaking technology and then synergised with the conventional BF ironmaking during plant expansion. Both these ironmaking furnaces are unique in nature, and have different operation philosophies. The performances of these units depend on the raw material charged, operational philosophies, maintenance, etc., and have their own advantages and disadvantages. This paper brings out the comparison between these ironmaking processes through the usage of raw material inputs, plant operation, maintenance, quality of hot metal and byproducts. This paper also highlights the benefits due to synergistic combination of Corex and BF in an integrated steel plant.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call