Abstract
An integral part of the operation of a tritium-handling facility is the need to maintain a tritium accounting system which meets both operational and regulatory requirements. The Darlington Tritium Removal Facility processes heavy water to remove tritium for storage or sale. The Chalk River Tritium Laboratory is a general-purpose experimental facility, handling various quantities and specific activities of tritium in separate systems, including re-packaging of tritium from large metal-getter storage beds to smaller aliquots. Tritium accounting procedures, analytical techniques and operational experience gained to date in the operation of these tritium-handling facilities are described.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.