Abstract

This paper describes briefly the operating experience and problems which have resulted from the installation of a four-wire, 120/208-volt secondary network system with combined light and power mains. The problems with reference to network equipment, voltage regulation, and operation of consumers' equipment are stated with their subsequent solution. The results obtained from fifteen months operation of this system indicate that, with reasonable care in layout and selection of equipment, no operating problems of major importance will be met.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.