Abstract
The Tritium Storage and Delivery System (TSDS) at TFTR was fabricated at Monsanto Mound Lab in the late 1970's and delivered to PPPL in the early 1980's. Commissioning progressed slowly and was finally completed in 1992 following a series of preoperational tests and integrated systems tests. Those tests included thorough leak testing of glove boxes and process piping, electrical interlocks and controls, instrumentation calibrations, volume determinations and verification of uranium bed capacity. The system accepted tritium in dilute form in May of 1993 and began serious usage of pure tritium in November 1993. As the throughput of high purity tritium increased, shortcomings of the system became evident and extensive repairs were implemented. System leakage and material compatibility were the primary causes of the problems. To date, the system has received, stored and delivered over 500 kCi of tritium and is performing very well. The dedicated quadrupole mass spectrometer and beta scintillator system has been analyzing tritium bearing and pure gas streams for over 3 years with minimal downtime.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.