Abstract

1. Operating experience at the Narva hydroelectric power station has confirmed the accuracy of a majority of accepted design solutions. The successful operation of the station is attributed to high-quality workmanship. 2. Basic problems associated with the elimination of equipment and hydraulic-structure shutdowns were solved during the previous operating period. 3. Work is constantly in progress at the station to upgrade the efficiency of the water use and the reliability of the equipment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.