Abstract

The high dependence on imported fuels and the potential for both climate change mitigation and economic diversification make Barbados' energy system particularly interesting for detailed transformation analysis. An open source energy system model is presented here for the analysis of a future Barbadian energy system. The model was applied in a scenario analysis, using a greenfield approach, to investigate cost-optimal and 100% renewable energy system configurations. Within the scenarios, the electrification of private passenger vehicles and cruise ships through shore-to-ship power supply was modelled to assess its impact on the energy system and the necessary investment in storage. Results show that for most scenarios of a system in 2030, a renewable energy share of over 80% is achieved in cost-optimal cases, even with a growing demand. The system's levelised costs of electricity range from 0.17 to 0.36 BBD/kWh in the cost-optimal scenarios and increase only moderately for 100% renewable systems. Under the reasonable assumption of decreasing photovoltaic investment costs, system costs of a 100% system may be lower than the current costs. The results show that pumped hydro-storage is a no-regret option for the Barbadian power system design. Overall, the results highlight the great potential of renewable energy as well as the technical and economic feasibility of a 100% renewable energy system for Barbados.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.