Abstract

In this paper we study online scheduling problem on m parallel uniform machines with two hierarchies. The objective is to minimize the maximum completion time (makespan). Machines are provided with different capability. The machines with speed s can schedule all jobs, while the other machines with speed 1 can only process partial jobs. Online algorithms for any 0<s<? are provided in the paper. For the case of k=1 and m=2, and the case of some values of s, k=1 and m=3, the algorithms are the best possible, where k is the number of machines with hierarchy 1, and m is the number of machines. Lower bounds for some special cases are also presented.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.