Abstract

The simplest method for making a production schedule is dispatch of jobs to idle machine tools. The method has a tendency of making a compact and efficient schedule, however the completion time of a job is not determined till the job is selected as the next job on an idle machine. Then, online scheduling methods have been developed, in which the production schedule is made as a job arrives at a machine. In this paper, an online scheduling method is developed for flexible flow shops under the due-date related criteria. A special feature of the method is to set the target completion time for each job and each stage. By numerical experiments, it is clarified that the method is better than FIFO (First In First Out) rule and especially the performance of the online scheduling is greatly superior to FIFO for the shops with heavy workload.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.