Abstract

We constructed an on-line partial discharge (PD) monitoring system (PDOM) with a CT sensor, an analogue-digital converter, and a tablet PC. A sampling frequency for data acquisition is 100 MHz, and we exchange on-site PD data through a cloud system. We successfully measured PDs in the early stage of insulation deterioration of a cross-linked polyethylene (XLPE) cable in a field site. Additionally, following PD detection by using a PDOM, we can locate a PD position by using a PD locator (PDL) system. By locating a PD, we can estimate the actual PD magnitude considering attenuation factor of a high frequency pulse. We show how the PDL system works on a XLPE cable network with time synchronization between two positions by using an injection current pulse. The locating accuracy of the PDL system is evaluated.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call