Abstract

Abstract: Heavy Equipment is an essential infrastructure industries. Traditional Equipment booking system such as phone, email and calls are time consuming, often leading to missed opportunities for both the customer and equipment rental companies. Online heavy equipment booking platforms have emerged as an alternative method that provides quick and easy access to rental equipment for construction and infrastructure projects. In a selected residential building construction project, Monte Equip mental simulation was applied for estimating the productivity on a construction site with selected parameters. The results reveal that scheduling heavy equipment and productivity are not given much consideration by Turkish construction enterprises, and their data on productivity only makes use of straightforward extrapolation for planned construction activities and daily papers from a machinery department. This paper briefly describes the features of the Turkish construction industry with reference to equipment scheduling and productivity evaluations in order to achieve significant cost reductions during construction projects. It also recommends simulation methods like Monte Equipment for estimating costs and productivity.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call