Abstract

The issue of strengthening weak or overloaded bases is an important task for the development of underground space. This is especially true in the presence of alternating weak layers at the base. The paper considers a case from the geotechnical practice of strengthening the overloaded base of a reinforced concrete foundation plate of a 25-storey residential building under construction. Combined ground piles consisting of Get (type 1) ground concrete piles reinforced along the longitudinal axis with made drill-injection piles using electric discharge technology (EDT piles) are used as buried structures. This method of arrangement of a combined buried reinforced concrete structure is due to the need to increase the load-bearing capacity of the pile on the ground by two times or more.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.