Abstract

We formulate an optimal control capital accumulation model with a Leontief-type production function and an exogenously given time-lag between investment and the accumulation of the capital stock, to analyze the qualitative and quantitative influence of time-lags on the system dynamics. As known from the time-to-build literature, optimal investment paths for positive and finite time-lags are in general cyclical, in contrast to the monotonic optimal paths for instantaneous capital accumulation. We show that the transition between instantaneous and time-lagged capital accumulation is continuous, in the sense that the greater is the time-lag between investment and capital accumulation, the more likely and more pronounced becomes cyclical behavior of the optimal paths.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.