Abstract

Event-based methods carefully select when to transmit information to enable high-performance control and estimation over resource-constrained communication networks. However, they come at a cost. For instance, event-based communication induces a higher computational load and increases the complexity of the scheduling problem. Thus, in some cases, allocating available slots to agents periodically in circular order may be superior. In this article, we discuss, for a specific example, when the additional complexity of event-based methods is beneficial. We evaluate our analysis in a synthetical example and on 20 simulated cart-pole systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.