Abstract

In any real time control system, its scheduling and control policy should be reassessed every time the state of the system changes. In large and complex systems, this could be a self‐defeating goal. Implementing real time control in such systems would require an enormous amount of computation time. Determination of discrete time interval (simulation window length) is the main objective of this study. To implement and demonstrate this methodology, we selected a Flexible Manufacturing System (FMS) which approximates a dynamic job shop. The Expert Control System (ECS) developed in this study integrated programmes for different functions and employed multi‐pass simulation to determine the best scheduling strategy in the system. The simulation output is then subjected to Analysis of Variance (ANOVA) and Newman‐Keuls′ range tests to obtain a “good” simulation window length for different performance criteria of optimisation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.