Abstract

The present research work proposes a simulation-based tool for short period production planning in industrial plants. The tool has been specifically developed for a real manufacturing system that produces high pressure hoses in the south of Italy. During the developmental phase, an advanced simulation approach, based on programming code and tables for information storage, was adopted. As a result the proposed modelling architecture ensures flexibility and high computational efficiency and allows comparison of the system's performances under different production planning scenarios obtained by applying dispatching rules, Genetic Algorithms (GAs) and Ant Colony Optimisation (ACO) algorithms. The suitability of the simulation outputs is ensured by the verification and validation activities carried out in the developmental phase; furthermore, specific subroutines allow the full integration of the simulation model with the company's ERP system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call