Abstract

In this paper, according to difference of the characteristics of the existing structure from design structure, the authors defined fortification intensity of the existing construction during succeeding use. It aims at the enhancement of antiseismic administration in city reconstruction at present. Some decision methods (Method of equal intensity, method of equal probability of exceedance, method of equal occurrence ratio) for fortification intensity in succeeding use period of existing construction were provided to meet higher levels of seismic fortification criterion and changing use of buildings. With earthquake risk analysis, it is useful for discussion on antiseismic endurance of construction. Language: en

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.