In this paper, we introduce a variant of the relocation problem, which was formulated from a public house redevelopment project in Boston. In the problem of interest, given some initial resources in a common pool there is a set of jobs to be processed on a two-machine flowshop. Each job acquires a specific number of resources to start its processing and will return a number of resources to the pool at its completion. The resource consumption and resource recycle processes are performed on machine one and machine two, respectively, in a two-machine flowshop style. Abiding by the resource constraints, the problem seeks to find a feasible schedule whose makespan is minimized. In this paper, we first present NP-hardness proofs for some special cases. Three heuristic algorithms are designed to compose approximate schedules. Two lower bounds are developed and then used to test the performance of our proposed heuristics. Numerical results from computational experiments suggest that the proposed heuristics can produce quality solutions in a reasonable time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.