Abstract

At present, the operation of protection coordination in a complex and uncertain power distribution system is satisfied through the use of a recloser and fuse. Due to the increased adoption of renewable energy resources, distributed energy resources as well as expanded electric transportation and dynamic demand response technologies in the power industry confront significant challenges during grid operations. As a result, protection coordination may be broken due to an increase in the current level in a power system. In general, once the protection is well coordinated by a fault current controller (FCC), the previously installed recloser on the existing power distribution system becomes useless because the FCC plays the role of the recloser. In this work, we propose an operating strategy of protection coordination for the FCC, which is capable of replacing the recloser in an environment where various types of distributed generation are introduced simultaneously due to the proliferating demand of renewable energy sources. Specifically, the suggested method based on PSCAD/EMTDC is investigated.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.