Abstract

The paper discusses the problem of operating complex and expensive telemetering equipment designed to monitor and control a multilayer field operation using the dual completion and injection method. The author offers an alternative to the applied wireless and wired data transmission (as the first type does not have the required range and the second does not have the required reliability) technology. It is a new method for monitoring and controlling reservoir pressure in real time based on recording the current gas factor of the products extracted from each layer using dual completion method and ensuring its relative stability due to the operational management of their reservoir pressure through the dual injection system. At the same time, it is proposed to use commercially available automated group measure unit equipped with corresponding sensors as the means of measuring gas/oil ratio. Testing the method of reservoir pressure management proposed by the author for the two-layer reservoir of the Tedinskoye field of Lukoil-Severneftegaz confirmed its effectiveness, which served as the basis for the development of an appropriate methodological guide and filing of a patent.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call