Abstract

Investigate the performance of priority rules on the stochastic version of RCMPSP.New robustness measures are proposed and the trade-off relationship with quality measures is studied.SP (Serial/Parallel) is used to generate the multi-project instances.Best recommendation is given considering both the quality and robustness measures. The majority of research studies the resource constrained multi-project scheduling problem in a deterministic environment, regardless of the uncertainty nature of the environment. In this paper, we assume that the activity duration is a stochastic variable, and propose two new robustness measures to analyse the performance of priority rules under a stochastic environment. A full factorial experiment is designed to solve the problem and investigate the relationship between project characteristics and the performance of priority rules. Furthermore, a trade-off relationship between the quality and robustness is investigated and the best priority rules are recommended from both a project and portfolio managers perspective.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.