Abstract

For a proposed highway bridge or culvert, the total cost to the public during its expected service life includes capital investment on the structures, regular operation and maintenance costs, and various flood related costs. The flood related damage costs include items such as replacement and repair costs of the highway bridge or culvert, flood plain property damage costs, users costs from traffic interruptions and detours, and others. As the design discharge increases, the required capital investment increases but the corresponding flood related damage costs decrease. Hydraulic design of a bridge or culvert using a riskbased approach is to choose among the alternatives the one associated with the least total expected cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.