Abstract

In this paper, we solve the optimal sequencing, lot-sizing and scheduling decisions for several products manufactured through several firms in a serial-type supply chain so as to minimise the sum of setup and inventory holding costs while meeting given demand from customers. We propose a three-phase heuristic to solve this NP-hard problem using a time-varying lot- sizing approach. First, based on the theoretical results, we obtain candidate sets of the production frequencies and cycle time using a junction-point heuristic. Next, we determine the production sequences for each firm using a bin-packing method. Finally, we obtain the production times of the products for each firm in the supply chain system by iteratively solving a set of linear simultaneous equations which were derived from the constraints. Then, we choose the best solution among the candidate solutions. Based on the numerical experiments, we show that the proposed three-phase heuristic efficiently obtains feasible solutions with excellent quality which is much better than the upper-bound solutions from the common cycle approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call