Abstract

Purpose. The purpose of the work is to develop the fundamentals of the design methodology of grounding system design of substations with open switchgears 330 (220) kV, which is aimed at ensuring electromagnetic compatibility of secondary circuits of current transformers. Methodology. To carry out the research, the provisions of the theory of experiment planning, the theory of electrical circuits, mathematical modeling in the package Grounding 1.0 and Microsoft Excel were used. Results. During the one-factor experiments, the dependencies of the grounding system resistance and the voltage between the calculated points on the grounding system area, the size of the grid cell, the perimeter of the grounding system horizontal electrodes cross-section, the equivalent soil resistivity, the short-circuit current and the design factor were obtained. It is shown that the grounding system resistance and the voltage between the calculated points are practically independent of the depth of the horizontal electrodes in the depth range from 0.4 m to 1.4 m. Originality. The paper formulated three criteria for grounding system designing of substations 330 (220) kV, aimed at ensuring electromagnetic compatibility of secondary circuits. Practical value. The fundamentals of the methodology for grounding system designing are formulated according to the criterion of preventing false triggering of relay protections in emergency modes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.