Abstract
In previous research (Tian & Demeulemeester, 2010), we have shown that in realistic situations railway scheduling improves both the stability and the expected project length over roadrunner scheduling. In this paper, we introduce the concept of resource flow networks in this analysis and determine what the impact is of the resulting combinations on the average project length, the standard deviation of the project length, the timely project completion probability and the stability cost. Extensive computational results will be presented on both small and larger projects and statistic analysis will be conducted by using SAS PROC GLM.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.