Abstract

This study explores the economic production quantity model with scrap, rework and stochastic machine breakdown. The main purpose of this paper is twofold:(P1) This paper will adopt the rigorous methods of mathematics to demonstrate that the expected total cost per unit time is convex on all positive numbers to improve the conditional convexity in Theorem 1 of Chiu et al. (2010) [7].(P2) This paper gives the concrete proof to provide bounds for the optimal production run time to remove the logical shortcomings of mathematics presented in proof of Theorem 2 of Chiu et al. (2010) [7].

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.