Abstract

AbstractThe paper discusses how to evaluate the reliability of units produced by different production lines. The procedure is based on selecting independent random samples of units produced by different production lines and then evaluating reliability functions for each group of units. The comparison between these reliability functions at a given time allows manufacturing experts to evaluate the effectiveness of production lines. A statistical methodology has been taken based on the assumption that the lifetime of units produced by each product line has a Weibull Gamma distribution. Then, real‐world data are used to illustrate the study's contribution to reliability theory applications.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.