Abstract

The major aspects linked to the use of the JET auxiliary heating systems: NBI, ICRF and LHCD, in the new JET ITER-like wall are presented. We show that although there were issues related to the operation of each system, efficient and safe plasma heating was obtained with room for higher power. For the NBI up to 25.7 MW was safely injected; issues that had to be tackled were mainly the beam shine-through and beam re-ionization before its entrance into the plasma. For the ICRF system, 5 MW were coupled in L-mode and 4 MW in H-mode; the main areas of concern were RF sheaths related heat loads and impurities production. For the LH, 2.5 MW were delivered without problems; arcing and generation of fast electron beams in front of the launcher that can lead to high heat loads were the keys issues. For each system, an overview will be given of: the main modifications implemented for safe use, their compatibility with the new metallic wall, the differences in behaviour compared with the previous carbon wall, with emphasis on heat loads and impurity content in the plasma.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.