Abstract

We consider the single-machine scheduling problem to minimize the weighted sum of completion times under precedence constraints. In a series of recent papers, it was established that this scheduling problem is a special case of minimum weighted vertex cover. In this paper, we show that the vertex cover graph associated with the scheduling problem is exactly the graph of incomparable pairs defined in the dimension theory of partial orders. Exploiting this relationship allows us to present a framework for obtaining (2-2/f)-approximation algorithms, provided that the set of precedence constraints has fractional dimension of at most f. Our approach yields the best-known approximation ratios for all previously considered special classes of precedence constraints, and it provides the first results for bounded degree and orders of interval dimension 2. On the negative side, we show that the addressed problem remains NP-hard even when restricted to the special case of interval orders. Furthermore, we prove that the general problem, if a fixed cost present in all feasible schedules is ignored, becomes as hard to approximate as vertex cover. We conclude by giving the first inapproximability result for this problem, showing under a widely believed assumption that it does not admit a polynomial-time approximation scheme.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.