Abstract

Development of U-type pre-stressed girders has been attempted to increase the length of I-type girders in South Korea. However, a length of 30 m or less is common because the self-weight, according to the post-tension method, is large. In this study, the pre-tension method was applied without limiting the post-tension method to induce a reduction in self-weight and in the materials used because of the decrease in the cross section. In addition, the authors proposed an application of an on-site pre-tensioning method using the internal reaction arm of a U-type girder. A pre-stressed concrete U-type girder bridge is composed of a concrete deck slab and a composite section. Structural performance characteristics, such as resistance and rigidity, were improved compared to those of the PSC I-type girders. Construction safety is also improved in the manufacturing and installation stages, and the elongation ratio is reduced because of the reduction in the weight of the girders. Therefore, it is possible to ensure the aesthetic landscape and economic efficiency of bridges. As a result, it is expected that efficient construction will be possible with high-quality factory-made and cast-in-place members. In this study, the pre-tension method is introduced in the field, and the analytical performance of the anchoring block used for tension is verified.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call