Abstract

Four optimization strategies were used to improve the average vibration isolation between the base and the end of a 10-m long two-dimensional (2D) cantilever truss structure. These were combinations of optimizing the structure geometry and the application of active vibration control (AVC) with optimal actuator positions. A power distribution analysis to investigate the mechanisms by which each strategy achieves reductions in the vibration transmission is reported. The trade-off is also explored between the freedom allowed in the size of the geometric changes and the number of actuators used in an AVC system to achieve a given level of vibration attenuation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.