Abstract

McNaughton's theorem (1959) states that preemptions in scheduling arbitrary processing time jobs on identical parallel machines to minimize the total weighted completion time are redundant. Du et al. (1991) proved that this remains true even though the jobs have precedence constraints in the form of chains. There are known simple counterexamples showing that other extensions of McNaughton's theorem to other criteria or more general precedence constraints such as intrees or outtrees, or different release dates of jobs, or different speeds of machines, are not true even for equal weights of jobs. In this paper we show that in the case of two machines and unit processing times, preemptions are still advantageous for intrees or machines with different speeds even for equal weights, or outtrees for different weights, but become redundant for outtrees and equal weights even for different release dates. We also conjecture that the latter statement is actually true for any number of machines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.