Abstract

Time-domain simulations are heavily used in today's planning and operation practices to assess power system transient stability, posttransient voltage/frequency profiles as well as oscillatory behavior following severe contingencies to comply with industry standards. Because of the increased modeling complexity, it is many times slower than real time for state-of-the-art commercial software packages to complete a dynamic simulation for a large-scale model. With the growing stochastic behavior introduced by emerging technologies, power industry has seen a growing need for performing security assessment in real time. This paper presents an innovative parallel implementation framework to speed up a single dynamic simulation by leveraging the existing stability model library in commercial tools through their application programming interfaces (APIs). Several high performance computing (HPC) techniques are explored and implemented such as parallelizing the calculation of generator current injection, identifying fast linear solvers for network solution, and parallelizing data outputs when interacting with APIs in the commercial package, TSAT. The proposed method has been tested on a Western Electricity Coordinating Council (WECC) planning base case with detailed synchronous generator models and it exhibits outstanding scalable performance with sufficient accuracy.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.