Abstract

A rescheduling method for new order arrival is presented based on the concept of dynamic pegging in multi-level production. Upon the arrival of new, unplanned orders, dynamic pegging enables the re-assignment of the Work-In-Progress (WIP) to the existing or newly arrived orders in such a way that the cost of rescheduling is minimized. A simple yet inspiring Mixed Integer Programming (MIP) model is proposed that combines dynamic pegging with rescheduling. The resulting schedules are compared with the ones obtained from two other basic rescheduling approaches. Analysis of the comparisons confirm the superiority of the proposed method in terms of total rescheduling costs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.